Twitter
Advertisement

"For feeding input to the Operation Room, 124 CCTV cameras

"The maximum speed limit permitted for vehicles plying inside twin tunnel tubes is 50 km per hour with head lights on at low beam.

Latest News
article-main
FacebookTwitterWhatsappLinkedin

have been installed at equal intervals of 75 meters, three-tier system has been fitted to light-up the tunnels round the clock," he said.

A SOS system has also been introduced to make contact with the team sitting in the Operation Room in case of an emergency besides effective fire fighting gadgets and hyper-sensitive ventilation system to ensure hassle free journey.

"The maximum speed limit permitted for vehicles plying inside twin tunnel tubes is 50 km per hour with head lights on at low beam. Containers carrying inflammable material are banned from entering the tunnel," he said.

Rathore said maximum height limit permitted is five meters and for checking the height special sensors have been installed just before the toll points at both ends.

"Besides providing mobile network of telecom operators, FM Radio channel facility is also functional inside the tunnel," he said.

The tunnel project involves construction of 9-km-long two lanes (13 metre diameter) of main tunnel along with parallel escape tunnel (6 metre diameter) interconnected with 29 cross passages at 300 meter interval

Rs 27 lakh worth of fuel is likely to be saved per day, he added.

The tunnel will also ensure preservation of pristine forest in ecological sensitive Patnitop area and will provide for better integration of Jammu not only with people of Kashmir but also with Kishtwar, Doda and Bhaderwah by providing better connectivity.

 

(This article has not been edited by DNA's editorial team and is auto-generated from an agency feed.)

Find your daily dose of news & explainers in your WhatsApp. Stay updated, Stay informed-  Follow DNA on WhatsApp.
Advertisement

Live tv

Advertisement
Advertisement