Added/Updated: 07/16/16 |
Scope: This project is primarily interior construction of a 170,000 Square Foot secure work area within the larger two-story, below grade heavily reinforced USFK Operations Center. This facility contains administrative offices, operation centers, data centers, electrical switchgears, uninterruptable power systems, Chemical, Biological, Radiation filtration systems all with redundant capability. Construction shall comply with Intelligence Community Directive (ICD) 705 Standards for Overseas construction. Building envelope is heavily reinforced concrete and includes freight and passenger elevators, multiple blast doors and compartmentalization. Facility, shall comply with DoD Antiterrorism/Force Protection Requirements and other threat mitigation measures. Construction shall comply with Intelligence Community Directive 705 (ICD 705) series documents and existing DoD standards for overseas construction. Building envelope, which includes blast doors and windows comply with DoD Antiterrorism/Force Protection requirements. Building also includes a two-stop, passenger/freight elevator. Project will also require installation of a crash rated perimeter fence, active barriers, Intrusion Detection Systems (IDS), Access Control Systems (ACS), and CCTV electronic security systems. |
Click HERE for a list of our other web sites
Contact us if you like to have a single PDF file with each report send in your email each day.