Concrete Work
data Price
Materuial cost
Lean concrete G15 (already mixed) RM185.00/m3
G25 Concrete (already mixed ) RM195.00/m3
G30 Concrete (already mixed ) RM210.00/m3
Shrinkage, concsolidation and wasteage 50%
Labour cost
Two unskilled worker (8Hours per day) RM52.50/person
Placing of concrete 0.6h/m3
Cost of vibrator for reinfoced concrete, 1.2m3/h, incluidng fuel RM360.00/day
Additional labour for working around reinforcement at 0.55hour/m³ RM52.50/day
Allow 15% profit including overhead
Calculation for lean concrete G15
material cost
Add shrinkage, concsolidation and wasteage 50%
RM185.00 x 1.5 = RM277.50/m3
Labour cost
Two unskilled worker per hour RM52.50/8x2 = RM13.13/h
placing concrete RM13.13 x 0.6 = RM7.88/m3
Total Cost for lean concrete G15
RM277.50+RM7.88=RM285.38
Allow 15% profit including overhead RM285.38 x 1.15= RM328.19/m3
RM328.19/m3 x 0.05(thk) = RM16.41/m2
Calculation for reinforced concrete G25
material cost
Add shrinkage, concsolidation and wasteage 50%
RM195.00 x 1.5 = RM292.50/m3
Plant cost
Vibrator per day RM360.00/8 = RM45.00/h
per m3 RM45.00 / 1.2 = RM37.5/m3
Labour cost
Two unskilled worker per hour RM52.50/8x2 = RM13.13/h
placing concrete RM13.13 x 0.6 = RM7.88/m3
Reinforcement work labour cost per m3 RM52.50/8=RM6.56/h
RM6.56 x 0.55 = RM3.61/m3
Total cost for reinforced concrete G25
RM292.50 + RM37.5 + RM7.88 + RM3.61 = RM341.49/m3
Allow 15% profit including overhead RM341.49 x 1.15= RM392.71/m3
Calculation for reinforced concrete G30
material cost
Add shrinkage, concsolidation and wasteage 50%
RM210.00 x 1.5 = RM315.00/m3
Plant cost
Vibrator per day RM360.00/8 = RM45.00/h
per m3 RM45.00 / 1.2 = RM37.5/m3
Labour cost
Two unskilled worker per hour RM52.50/8x2 = RM13.13/h
placing concrete RM13.13 x 0.6 = RM7.88/m3
Reinforcement work labour cost per m3 RM52.50/8=RM6.56/hRM6.56 x 0.55 = RM3.61/m3
Total cost for reinforced concrete G30
RM315.00 + RM37.5 + RM7.88 + RM3.61 = RM363.99/m3
Allow 15% profit including overhead RM363.99 x 1.15= RM418.59/m3
Hardcore
Data Price
material cost
hardcore material RM7.5/m2
Allow 10% compaction
Labour cost
One unskilled worker, 8hours per day
Allow 15% profir including overhead RM52.50/person
Placing hardcore at 8m2/h
Calculation for hardcore
Material cost
Allow 10% compaction RM7.50 x 1.10 = RM8.25/m2
Labour cost
One unskilled worker per hour RM52.50/8 = RM6.56/h
Placing hardcore RM6.56/1.2 = RM5.47/m2
Total cost for hardcore
RM8.25 + RM5.47 = RM13.72/m2
Allow 15% profit including overhead RM13.72 x 1.15= RM15.78/m2
10mm dia high tensile Reinforcement Bar Cost
Data Price
material cost
10mm diameter bar delivered to site RM2700/tonne
Allow labour stacking and loading RM7/tonne
Tie wire at 0.66kg/100kg of reinforcement bar RM500/tonne
Allow spacers for rebar RM6/tonne
Allow 7% waste
Allow margin RM22/tonne
Allow 15% profit including overhead
Labour cost
One skilled labour, 8hours/day RM125/person
one unskilled worker, 8hours/day RM52.50/person
Allow 10% idling time
Select 28 minutes
Cut 32 minutes
Bend 35 minutes
Fix 23 minutes
Hoist Twice 7 minutes
calculation for 10mm h.t bar
material cost
10mm diameter h.t bar RM2700/tonne
Allow labour stacking and loading RM7/tonne
Tie wire (0.66kg/100kg) x 1000 x (500/1000) = RM3.3/tonne
Spacer RM6/tonne
Allow 7% waste RM2700 x 0.07 = RM189/tonne
Margin RM22/tonne
Total RM2927.3/tonne
Labour cost
Skilled worker per hour Rm125/8 = RM15.63/h
One unskilled worker per hour RM52.50/8 = RM6.56/h
total RM15.63 + RM6.56 = RM22.19/h
Allow 10% idling time RM22.19 x 1.10 = RM24.41/h
Time required for
Select, cut, bend, fix and hoist twice (28+32+35+23+7)minutes = 125minutes
Labour cost (125minutes / 60) x RM24.41 = RM50.85/kg = RM508.54/tonne
Total cost for 10mm h.t bar
RM2927.3 + RM508.54 = RM3435.84/tonne
Allow 15% profit including overhead RM3435.84 x 1.15= RM3951.22/tonne
12mm dia high tensile Reinforcement Bar Cost
Data Price
material cost
12mm diameter bar delivered to site RM2700/tonne
Allow labour stacking and loading RM7/tonne
Tie wire at 0.66kg/100kg of reinforcement bar RM500/tonne
Allow spacers for rebar RM6/tonne
Allow 7% waste
Allow margin RM22/tonne
Allow 15% profit including overhead
Labour cost
One skilled labour, 8hours/day RM125/person
one unskilled worker, 8hours/day RM52.50/person
Allow 10% idling time
Select 28 minutes
Cut 32 minutes
Bend 35 minutes
Fix 23 minutes
Hoist Twice 7 minutes
calculation for 12mm h.t bar
material cost
12mm diameter h.t bar RM2700/tonne
Allow labour stacking and loading RM7/tonne
Tie wire (0.66kg/100kg) x 1000 x (500/1000) = RM3.3/tonne
Spacer RM6/tonne
Allow 7% waste RM2700 x 0.07 = RM189/tonne
Margin RM22/tonne
Total RM2927.3/tonne
Labour cost
Skilled worker per hour Rm125/8 = RM15.63/h
One unskilled worker per hour RM52.50/8 = RM6.56/h
total RM15.63 + RM6.56 = RM22.19/h
Allow 10% idling time RM22.19 x 1.10 = RM24.41/h
Time required for
Select, cut, bend, fix and hoist twice (28+32+35+23+7)minutes = 125minutes
Labour cost (125minutes / 60) x RM24.41 = RM50.85/kg = RM508.54/tonne
Total cost for 12mm h.t bar
RM2927.3 + RM508.54 = RM3435.84/tonne
Allow 15% profit including overhead RM3435.84 x 1.15= RM3951.22/tonne
16mm dia high tensile Reinforcement Bar Cost
Data Price
material cost
16mm diameter bar delivered to site RM2650/tonne
Allow labour stacking and loading RM7/tonne
Tie wire at 0.66kg/100kg of reinforcement bar RM500/tonne
Allow spacers for rebar RM6/tonne
Allow 7% waste
Allow margin RM22/tonne
Allow 15% profit including overhead
Labour cost
One skilled labour, 8hours/day RM125/person
one unskilled worker, 8hours/day RM52.50/person
Allow 10% idling time
Select 28 minutes
Cut 32 minutes
Bend 35 minutes
Fix 23 minutes
Hoist Twice 7 minutes
calculation for 16mm h.t bar
material cost
16mm diameter h.t bar RM2650/tonne
Allow labour stacking and loading RM7/tonne
Tie wire (0.66kg/100kg) x 1000 x (500/1000) = RM3.3/tonne
Spacer RM6/tonne
Allow 7% waste RM2650 x 0.07 = RM185.5/tonne
Margin RM22/tonne
Total RM2873.8/tonne
Labour cost
Skilled worker per hour Rm125/8 = RM15.63/h
One unskilled worker per hour RM52.50/8 = RM6.56/h
total RM15.63 + RM6.56 = RM22.19/h
Allow 10% idling time RM22.19 x 1.10 = RM24.41/h
Time required for
Select, cut, bend, fix and hoist twice (28+32+35+23+7)minutes = 125minutes
Labour cost (125minutes / 60) x RM24.41 = RM50.85/kg = RM508.54/tonne
Total cost for 16mm h.t bar
RM2873.8 + RM508.54 = RM3382.34/tonne
Allow 15% profit including overhead RM3382.34 x 1.15= RM3889.69/tonne
8mm dia mild steel Reinforcement Bar Cost
Data Price
material cost
8mm diameter bar delivered to site RM 1250/ 800kg
Allow labour stacking and loading RM7/tonne
Tie wire at 0.66kg/100kg of reinforcement bar RM500/tonne
Allow spacers for rebar RM6/tonne
Allow 7% waste
Allow margin RM22/tonne
Allow 15% profit including overhead
Labour cost
One skilled labour, 8hours/day RM125/person
one unskilled worker, 8hours/day RM52.50/person
Allow 10% idling time
Select 28 minutes
Cut 32 minutes
Bend 35 minutes
Fix 23 minutes
Hoist Twice 7 minutes
calculation for 8mm m.s bar
material cost
8mm diameter h.t bar 1250/800 x 1000 RM1562.5/tonne
Allow labour stacking and loading RM7/tonne
Tie wire (0.66kg/100kg) x 1000 x (500/1000) = RM3.3/tonne
Spacer RM6/tonne
Allow 7% waste RM1562.5 x 0.07 = RM109.38/tonne
Margin RM22/tonne
Total RM1710.18/tonne
Labour cost
Skilled worker per hour Rm125/8 = RM15.63/h
One unskilled worker per hour RM52.50/8 = RM6.56/h
total RM15.63 + RM6.56 = RM22.19/h
Allow 10% idling time RM22.19 x 1.10 = RM24.41/h
Time required for
Select, cut, bend, fix and hoist twice (28+32+35+23+7)minutes = 125minutes
Labour cost (125minutes / 60) x RM24.41 = RM50.85/kg = RM508.54/tonne
Total cost for 8mm m.s bar
RM1710.18 + RM508.54 = RM2218.72/tonne
Allow 15% profit including overhead RM2218.72 x 1.15= RM2551.53/tonne
10mm dia mild steel Reinforcement Bar Cost
Data Price
material cost RM1802 /tonne
10mm diameter bar delivered to site RM/tonne
Allow labour stacking and loading RM7/tonne
Tie wire at 0.66kg/100kg of reinforcement bar RM500/tonne
Allow spacers for rebar RM6/tonne
Allow 7% waste
Allow margin RM22/tonne
Allow 15% profit including overhead
Labour cost
One skilled labour, 8hours/day RM125/person
one unskilled worker, 8hours/day RM52.50/person
Allow 10% idling time
Select 28 minutes
Cut 32 minutes
Bend 35 minutes
Fix 23 minutes
Hoist Twice 7 minutes
calculation for 10mm m.s bar
material cost
10mm diameter h.t bar RM1802/tonne
Allow labour stacking and loading RM7/tonne
Tie wire (0.66kg/100kg) x 1000 x (500/1000) = RM3.3/tonne
Spacer RM6/tonne
Allow 7% waste RM1802 x 0.07 = RM126.14/tonne
Margin RM22/tonne
Total RM1966.44/tonne
Labour cost
Skilled worker per hour Rm125/8 = RM15.63/h
One unskilled worker per hour RM52.50/8 = RM6.56/h
total RM15.63 + RM6.56 = RM22.19/h
Allow 10% idling time RM22.19 x 1.10 = RM24.41/h
Time required for
Select, cut, bend, fix and hoist twice (28+32+35+23+7)minutes = 125minutes
Labour cost (125minutes / 60) x RM24.41 = RM50.85/kg = RM508.54/tonne
Total cost for 10mm m.s bar
RM1966.44 + RM508.54 = RM2474.98/tonne
Allow 15% profit including overhead RM2474.98 x 1.15= RM2846.23/tonne
A6:2.61kg/m2 layer of Steel Fabric Reinforcement Cost
Data Price
A6:2.61kg/m2 RM10.00/m2
Allow 5% wastage
Lablour cost
2 unskilled labour, 8hoours/day RM52.50/person
allow 10% idling time
Allow 15% profit including overhead
Calculation for BRC A6:2.61kg/m2
material cost
Allow 5% wastage RM10 x 1.05 = RM10.5
Labour cost
Two unskilled worker per hour RM52.50/8x2 = RM13.13/h
allow 10% idling time RM13.13 x 1.10 = RM14.14/h
total cost
RM10.5 + RM14.14 = RM24.64/m2
Allow 15% profit including overhead RM24.63 x 1.15% = RM28.34/m2
A8:3.01kg/m2 layer of Steel Fabric Reinforcement Cost
Data Price
A8:3.01kg/m2 RM12.10/m2
Allow 5% wastage
Lablour cost
2 unskilled labour, 8hoours/day RM52.50/person
allow 10% idling time
Allow 15% profit including overhead
Calculation for BRC A8:3.01kg/m2
material cost
Allow 5% wastage RM12.10 x 1.05% = RM12.71/m2
Labour cost
Two unskilled worker per hour RM52.50/8x2 = RM13.13/h
allow 10% idling time RM13.13 x 1.10 = RM14.14/h
total cost
RM12.71 + RM14.14 = RM26.85
Allow 15% profit including overhead RM26.85 x 1.15% = RM30.88/m2

More Related Content

What's hot

Estimating calculation
Estimating calculationEstimating calculation
Estimating calculationZIyeeTan
 
97170708 estimate-of-material-and-labor
97170708 estimate-of-material-and-labor97170708 estimate-of-material-and-labor
97170708 estimate-of-material-and-laborimaduddin91
 
civil datas for estimate
civil datas for estimatecivil datas for estimate
civil datas for estimatealwin prabakar
 
DIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAM
DIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAMDIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAM
DIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAMAnep Botak
 
Estimating calculation
Estimating calculationEstimating calculation
Estimating calculationZIyeeTan
 
Factors affeccting cost estimates of a project
Factors affeccting cost estimates of a projectFactors affeccting cost estimates of a project
Factors affeccting cost estimates of a projectAr.Vijay Kumar
 
Assignment - Single Storey Show House (Presentation)
Assignment - Single Storey Show House (Presentation)Assignment - Single Storey Show House (Presentation)
Assignment - Single Storey Show House (Presentation)Kai Yun Pang
 
Measurement II BQ
Measurement II BQMeasurement II BQ
Measurement II BQashleyyeap
 
SMM7 Bill of Quantities
SMM7 Bill of QuantitiesSMM7 Bill of Quantities
SMM7 Bill of QuantitiesNatalie Reid
 
ECA Workshop - Brief
ECA Workshop - BriefECA Workshop - Brief
ECA Workshop - BriefKai Yun Pang
 
Analysis of rates for labour and material
Analysis of rates for labour and materialAnalysis of rates for labour and material
Analysis of rates for labour and materialALI HYDER GADHI
 
Pp2 final account assignment excel
Pp2 final account assignment excelPp2 final account assignment excel
Pp2 final account assignment excelashleyyeap
 
Provisional sum prime cost sum
Provisional sum  prime cost sumProvisional sum  prime cost sum
Provisional sum prime cost sumEst
 
Pp2 coursework 2 201808
Pp2 coursework 2   201808Pp2 coursework 2   201808
Pp2 coursework 2 201808Arissa Loh
 
Eco button- One small click one big change
Eco button- One small click one big changeEco button- One small click one big change
Eco button- One small click one big changealind tiwari
 

What's hot (20)

Car park bq
Car park bqCar park bq
Car park bq
 
Estimating calculation
Estimating calculationEstimating calculation
Estimating calculation
 
97170708 estimate-of-material-and-labor
97170708 estimate-of-material-and-labor97170708 estimate-of-material-and-labor
97170708 estimate-of-material-and-labor
 
civil datas for estimate
civil datas for estimatecivil datas for estimate
civil datas for estimate
 
DIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAM
DIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAMDIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAM
DIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAM
 
Estimating calculation
Estimating calculationEstimating calculation
Estimating calculation
 
ECA presentation
ECA presentationECA presentation
ECA presentation
 
Factors affeccting cost estimates of a project
Factors affeccting cost estimates of a projectFactors affeccting cost estimates of a project
Factors affeccting cost estimates of a project
 
Assignment - Single Storey Show House (Presentation)
Assignment - Single Storey Show House (Presentation)Assignment - Single Storey Show House (Presentation)
Assignment - Single Storey Show House (Presentation)
 
Measurement II BQ
Measurement II BQMeasurement II BQ
Measurement II BQ
 
SMM7 Bill of Quantities
SMM7 Bill of QuantitiesSMM7 Bill of Quantities
SMM7 Bill of Quantities
 
ECA Workshop - Brief
ECA Workshop - BriefECA Workshop - Brief
ECA Workshop - Brief
 
Analysis of rates for labour and material
Analysis of rates for labour and materialAnalysis of rates for labour and material
Analysis of rates for labour and material
 
Pp2 final account assignment excel
Pp2 final account assignment excelPp2 final account assignment excel
Pp2 final account assignment excel
 
Contoh penawaran jembatan
Contoh penawaran jembatanContoh penawaran jembatan
Contoh penawaran jembatan
 
Bricks
Bricks Bricks
Bricks
 
Provisional sum prime cost sum
Provisional sum  prime cost sumProvisional sum  prime cost sum
Provisional sum prime cost sum
 
EQS - RATE ANALYSIS.pdf
EQS -  RATE ANALYSIS.pdfEQS -  RATE ANALYSIS.pdf
EQS - RATE ANALYSIS.pdf
 
Pp2 coursework 2 201808
Pp2 coursework 2   201808Pp2 coursework 2   201808
Pp2 coursework 2 201808
 
Eco button- One small click one big change
Eco button- One small click one big changeEco button- One small click one big change
Eco button- One small click one big change
 

Viewers also liked

Η εργασία του Κωστή
Η εργασία του ΚωστήΗ εργασία του Κωστή
Η εργασία του ΚωστήMartaki Fani
 
Adv & Adj Comp
Adv & Adj CompAdv & Adj Comp
Adv & Adj CompAlkin
 
Hamid sain's course record of philosophy and the sciences: introduction to th...
Hamid sain's course record of philosophy and the sciences: introduction to th...Hamid sain's course record of philosophy and the sciences: introduction to th...
Hamid sain's course record of philosophy and the sciences: introduction to th...Dr Hamid Sain MBBS(Ad.)FRCSEd
 
αφισα-θεατρικές δημιουργίες
αφισα-θεατρικές δημιουργίεςαφισα-θεατρικές δημιουργίες
αφισα-θεατρικές δημιουργίεςvasilikiarvan
 
Η εργασία του Αλέξανδρου
Η εργασία του ΑλέξανδρουΗ εργασία του Αλέξανδρου
Η εργασία του ΑλέξανδρουMartaki Fani
 
Teollisuustuotanto elpyy – kansantalous uuteen nousuun
Teollisuustuotanto elpyy – kansantalous uuteen nousuunTeollisuustuotanto elpyy – kansantalous uuteen nousuun
Teollisuustuotanto elpyy – kansantalous uuteen nousuunPalkansaajien tutkimuslaitos
 
YPO/WPO Conferrence @ HEC Montréal : Designing and Assessing Customer & Emplo...
YPO/WPO Conferrence @ HEC Montréal : Designing and Assessing Customer & Emplo...YPO/WPO Conferrence @ HEC Montréal : Designing and Assessing Customer & Emplo...
YPO/WPO Conferrence @ HEC Montréal : Designing and Assessing Customer & Emplo...Pierre-Majorique Léger
 
Οι Βαλκανικοί πόλεμοι με το λογισμικό Centennia
Οι Βαλκανικοί πόλεμοι με το λογισμικό CentenniaΟι Βαλκανικοί πόλεμοι με το λογισμικό Centennia
Οι Βαλκανικοί πόλεμοι με το λογισμικό CentenniaEvi Kousidou
 
Introduction to Graph Theory
Introduction to Graph TheoryIntroduction to Graph Theory
Introduction to Graph Theory Kazi Md. Saidul
 
β 1. η ακμη της ευρωπαϊκης αποικιοκρατιας (1871 1914)
β 1. η ακμη της ευρωπαϊκης αποικιοκρατιας (1871 1914)β 1. η ακμη της ευρωπαϊκης αποικιοκρατιας (1871 1914)
β 1. η ακμη της ευρωπαϊκης αποικιοκρατιας (1871 1914)Πηνελόπη Ρασιδάκη
 
software assignment
software assignmentsoftware assignment
software assignmentseenyeeyong
 
CoolTool NeuroLab Eye Tracking testing
CoolTool NeuroLab Eye Tracking testingCoolTool NeuroLab Eye Tracking testing
CoolTool NeuroLab Eye Tracking testingKateryna Khozroshyna
 

Viewers also liked (20)

Η εργασία του Κωστή
Η εργασία του ΚωστήΗ εργασία του Κωστή
Η εργασία του Κωστή
 
пуртова
пуртовапуртова
пуртова
 
Adv & Adj Comp
Adv & Adj CompAdv & Adj Comp
Adv & Adj Comp
 
Hamid sain's course record of philosophy and the sciences: introduction to th...
Hamid sain's course record of philosophy and the sciences: introduction to th...Hamid sain's course record of philosophy and the sciences: introduction to th...
Hamid sain's course record of philosophy and the sciences: introduction to th...
 
αφισα-θεατρικές δημιουργίες
αφισα-θεατρικές δημιουργίεςαφισα-θεατρικές δημιουργίες
αφισα-θεατρικές δημιουργίες
 
Btec Certificate
Btec CertificateBtec Certificate
Btec Certificate
 
Η εργασία του Αλέξανδρου
Η εργασία του ΑλέξανδρουΗ εργασία του Αλέξανδρου
Η εργασία του Αλέξανδρου
 
Teollisuustuotanto elpyy – kansantalous uuteen nousuun
Teollisuustuotanto elpyy – kansantalous uuteen nousuunTeollisuustuotanto elpyy – kansantalous uuteen nousuun
Teollisuustuotanto elpyy – kansantalous uuteen nousuun
 
WHISHWORKS - Company Profile
WHISHWORKS - Company ProfileWHISHWORKS - Company Profile
WHISHWORKS - Company Profile
 
Wordpress SEO and Security - AAC2016
Wordpress SEO and Security - AAC2016Wordpress SEO and Security - AAC2016
Wordpress SEO and Security - AAC2016
 
YPO/WPO Conferrence @ HEC Montréal : Designing and Assessing Customer & Emplo...
YPO/WPO Conferrence @ HEC Montréal : Designing and Assessing Customer & Emplo...YPO/WPO Conferrence @ HEC Montréal : Designing and Assessing Customer & Emplo...
YPO/WPO Conferrence @ HEC Montréal : Designing and Assessing Customer & Emplo...
 
Οι Βαλκανικοί πόλεμοι με το λογισμικό Centennia
Οι Βαλκανικοί πόλεμοι με το λογισμικό CentenniaΟι Βαλκανικοί πόλεμοι με το λογισμικό Centennia
Οι Βαλκανικοί πόλεμοι με το λογισμικό Centennia
 
Introduction to Graph Theory
Introduction to Graph TheoryIntroduction to Graph Theory
Introduction to Graph Theory
 
β 1. η ακμη της ευρωπαϊκης αποικιοκρατιας (1871 1914)
β 1. η ακμη της ευρωπαϊκης αποικιοκρατιας (1871 1914)β 1. η ακμη της ευρωπαϊκης αποικιοκρατιας (1871 1914)
β 1. η ακμη της ευρωπαϊκης αποικιοκρατιας (1871 1914)
 
software assignment
software assignmentsoftware assignment
software assignment
 
Els paisatges
Els paisatgesEls paisatges
Els paisatges
 
Paisatjes del mon
Paisatjes del monPaisatjes del mon
Paisatjes del mon
 
CoolTool NeuroLab Eye Tracking testing
CoolTool NeuroLab Eye Tracking testingCoolTool NeuroLab Eye Tracking testing
CoolTool NeuroLab Eye Tracking testing
 
Webdesign, UX et UCD #3
Webdesign, UX et UCD #3Webdesign, UX et UCD #3
Webdesign, UX et UCD #3
 
Content creation 101
Content creation 101Content creation 101
Content creation 101
 

Similar to Estimating

Spin plan for 80s combed yarn
Spin plan for 80s combed yarnSpin plan for 80s combed yarn
Spin plan for 80s combed yarnSwaraz Mollick
 
Estimating seminar 2 glazing answer
Estimating seminar 2 glazing answerEstimating seminar 2 glazing answer
Estimating seminar 2 glazing answerDoreen Yeo
 
Investment cost analysis 10 sets of press wood pallet machine production line
Investment cost analysis 10 sets of press wood pallet machine production lineInvestment cost analysis 10 sets of press wood pallet machine production line
Investment cost analysis 10 sets of press wood pallet machine production lineRobin Wu
 
Rate Analysis Site Meeting
Rate Analysis   Site MeetingRate Analysis   Site Meeting
Rate Analysis Site MeetingSanjay Patnaik
 

Similar to Estimating (10)

Excavation
ExcavationExcavation
Excavation
 
Spin plan for 80s combed yarn
Spin plan for 80s combed yarnSpin plan for 80s combed yarn
Spin plan for 80s combed yarn
 
Estimating seminar 2 glazing answer
Estimating seminar 2 glazing answerEstimating seminar 2 glazing answer
Estimating seminar 2 glazing answer
 
MANAGEMENT ACCOUNTING
MANAGEMENT ACCOUNTING MANAGEMENT ACCOUNTING
MANAGEMENT ACCOUNTING
 
Sato
SatoSato
Sato
 
Sato
SatoSato
Sato
 
Sato
SatoSato
Sato
 
Investment cost analysis 10 sets of press wood pallet machine production line
Investment cost analysis 10 sets of press wood pallet machine production lineInvestment cost analysis 10 sets of press wood pallet machine production line
Investment cost analysis 10 sets of press wood pallet machine production line
 
Rate Analysis Site Meeting
Rate Analysis   Site MeetingRate Analysis   Site Meeting
Rate Analysis Site Meeting
 
Operation management problems
Operation management problemsOperation management problems
Operation management problems
 

More from Enoch Wong

BE workshop presentation
BE workshop presentation BE workshop presentation
BE workshop presentation Enoch Wong
 
PP1 assignment
PP1 assignment PP1 assignment
PP1 assignment Enoch Wong
 
Measurement 4
Measurement 4 Measurement 4
Measurement 4 Enoch Wong
 
Management Science
Management Science Management Science
Management Science Enoch Wong
 
Building services
Building services Building services
Building services Enoch Wong
 
Strategy management group assignment
Strategy management group assignment Strategy management group assignment
Strategy management group assignment Enoch Wong
 
Fieldwork 1 (leveling)
Fieldwork 1 (leveling)Fieldwork 1 (leveling)
Fieldwork 1 (leveling)Enoch Wong
 
Fieldwork 2 (Traversing)
Fieldwork 2 (Traversing)Fieldwork 2 (Traversing)
Fieldwork 2 (Traversing)Enoch Wong
 

More from Enoch Wong (9)

BE workshop presentation
BE workshop presentation BE workshop presentation
BE workshop presentation
 
PP1 assignment
PP1 assignment PP1 assignment
PP1 assignment
 
Measurement 4
Measurement 4 Measurement 4
Measurement 4
 
Management Science
Management Science Management Science
Management Science
 
Building services
Building services Building services
Building services
 
Strategy management group assignment
Strategy management group assignment Strategy management group assignment
Strategy management group assignment
 
Fieldwork 1 (leveling)
Fieldwork 1 (leveling)Fieldwork 1 (leveling)
Fieldwork 1 (leveling)
 
Fieldwork 2 (Traversing)
Fieldwork 2 (Traversing)Fieldwork 2 (Traversing)
Fieldwork 2 (Traversing)
 
Site report
Site reportSite report
Site report
 

Recently uploaded

Reading and Writing Skills 11 quarter 4 melc 1
Reading and Writing Skills 11 quarter 4 melc 1Reading and Writing Skills 11 quarter 4 melc 1
Reading and Writing Skills 11 quarter 4 melc 1GloryAnnCastre1
 
ClimART Action | eTwinning Project
ClimART Action    |    eTwinning ProjectClimART Action    |    eTwinning Project
ClimART Action | eTwinning Projectjordimapav
 
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...DhatriParmar
 
Congestive Cardiac Failure..presentation
Congestive Cardiac Failure..presentationCongestive Cardiac Failure..presentation
Congestive Cardiac Failure..presentationdeepaannamalai16
 
31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...
31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...
31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...Nguyen Thanh Tu Collection
 
Multi Domain Alias In the Odoo 17 ERP Module
Multi Domain Alias In the Odoo 17 ERP ModuleMulti Domain Alias In the Odoo 17 ERP Module
Multi Domain Alias In the Odoo 17 ERP ModuleCeline George
 
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxHumphrey A Beña
 
DIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptx
DIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptxDIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptx
DIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptxMichelleTuguinay1
 
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptxQ4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptxlancelewisportillo
 
Man or Manufactured_ Redefining Humanity Through Biopunk Narratives.pptx
Man or Manufactured_ Redefining Humanity Through Biopunk Narratives.pptxMan or Manufactured_ Redefining Humanity Through Biopunk Narratives.pptx
Man or Manufactured_ Redefining Humanity Through Biopunk Narratives.pptxDhatriParmar
 
4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptx4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptxmary850239
 
Narcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdfNarcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdfPrerana Jadhav
 
MS4 level being good citizen -imperative- (1) (1).pdf
MS4 level   being good citizen -imperative- (1) (1).pdfMS4 level   being good citizen -imperative- (1) (1).pdf
MS4 level being good citizen -imperative- (1) (1).pdfMr Bounab Samir
 
Q-Factor HISPOL Quiz-6th April 2024, Quiz Club NITW
Q-Factor HISPOL Quiz-6th April 2024, Quiz Club NITWQ-Factor HISPOL Quiz-6th April 2024, Quiz Club NITW
Q-Factor HISPOL Quiz-6th April 2024, Quiz Club NITWQuiz Club NITW
 
Decoding the Tweet _ Practical Criticism in the Age of Hashtag.pptx
Decoding the Tweet _ Practical Criticism in the Age of Hashtag.pptxDecoding the Tweet _ Practical Criticism in the Age of Hashtag.pptx
Decoding the Tweet _ Practical Criticism in the Age of Hashtag.pptxDhatriParmar
 
How to Fix XML SyntaxError in Odoo the 17
How to Fix XML SyntaxError in Odoo the 17How to Fix XML SyntaxError in Odoo the 17
How to Fix XML SyntaxError in Odoo the 17Celine George
 
Mythology Quiz-4th April 2024, Quiz Club NITW
Mythology Quiz-4th April 2024, Quiz Club NITWMythology Quiz-4th April 2024, Quiz Club NITW
Mythology Quiz-4th April 2024, Quiz Club NITWQuiz Club NITW
 
Concurrency Control in Database Management system
Concurrency Control in Database Management systemConcurrency Control in Database Management system
Concurrency Control in Database Management systemChristalin Nelson
 

Recently uploaded (20)

Reading and Writing Skills 11 quarter 4 melc 1
Reading and Writing Skills 11 quarter 4 melc 1Reading and Writing Skills 11 quarter 4 melc 1
Reading and Writing Skills 11 quarter 4 melc 1
 
ClimART Action | eTwinning Project
ClimART Action    |    eTwinning ProjectClimART Action    |    eTwinning Project
ClimART Action | eTwinning Project
 
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...
 
Congestive Cardiac Failure..presentation
Congestive Cardiac Failure..presentationCongestive Cardiac Failure..presentation
Congestive Cardiac Failure..presentation
 
31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...
31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...
31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...
 
Multi Domain Alias In the Odoo 17 ERP Module
Multi Domain Alias In the Odoo 17 ERP ModuleMulti Domain Alias In the Odoo 17 ERP Module
Multi Domain Alias In the Odoo 17 ERP Module
 
Faculty Profile prashantha K EEE dept Sri Sairam college of Engineering
Faculty Profile prashantha K EEE dept Sri Sairam college of EngineeringFaculty Profile prashantha K EEE dept Sri Sairam college of Engineering
Faculty Profile prashantha K EEE dept Sri Sairam college of Engineering
 
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
 
DIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptx
DIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptxDIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptx
DIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptx
 
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptxQ4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
 
Man or Manufactured_ Redefining Humanity Through Biopunk Narratives.pptx
Man or Manufactured_ Redefining Humanity Through Biopunk Narratives.pptxMan or Manufactured_ Redefining Humanity Through Biopunk Narratives.pptx
Man or Manufactured_ Redefining Humanity Through Biopunk Narratives.pptx
 
4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptx4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptx
 
Narcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdfNarcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdf
 
MS4 level being good citizen -imperative- (1) (1).pdf
MS4 level   being good citizen -imperative- (1) (1).pdfMS4 level   being good citizen -imperative- (1) (1).pdf
MS4 level being good citizen -imperative- (1) (1).pdf
 
Mattingly "AI & Prompt Design: Large Language Models"
Mattingly "AI & Prompt Design: Large Language Models"Mattingly "AI & Prompt Design: Large Language Models"
Mattingly "AI & Prompt Design: Large Language Models"
 
Q-Factor HISPOL Quiz-6th April 2024, Quiz Club NITW
Q-Factor HISPOL Quiz-6th April 2024, Quiz Club NITWQ-Factor HISPOL Quiz-6th April 2024, Quiz Club NITW
Q-Factor HISPOL Quiz-6th April 2024, Quiz Club NITW
 
Decoding the Tweet _ Practical Criticism in the Age of Hashtag.pptx
Decoding the Tweet _ Practical Criticism in the Age of Hashtag.pptxDecoding the Tweet _ Practical Criticism in the Age of Hashtag.pptx
Decoding the Tweet _ Practical Criticism in the Age of Hashtag.pptx
 
How to Fix XML SyntaxError in Odoo the 17
How to Fix XML SyntaxError in Odoo the 17How to Fix XML SyntaxError in Odoo the 17
How to Fix XML SyntaxError in Odoo the 17
 
Mythology Quiz-4th April 2024, Quiz Club NITW
Mythology Quiz-4th April 2024, Quiz Club NITWMythology Quiz-4th April 2024, Quiz Club NITW
Mythology Quiz-4th April 2024, Quiz Club NITW
 
Concurrency Control in Database Management system
Concurrency Control in Database Management systemConcurrency Control in Database Management system
Concurrency Control in Database Management system
 

Estimating

  • 1. Concrete Work data Price Materuial cost Lean concrete G15 (already mixed) RM185.00/m3 G25 Concrete (already mixed ) RM195.00/m3 G30 Concrete (already mixed ) RM210.00/m3 Shrinkage, concsolidation and wasteage 50% Labour cost Two unskilled worker (8Hours per day) RM52.50/person Placing of concrete 0.6h/m3 Cost of vibrator for reinfoced concrete, 1.2m3/h, incluidng fuel RM360.00/day Additional labour for working around reinforcement at 0.55hour/m³ RM52.50/day Allow 15% profit including overhead Calculation for lean concrete G15 material cost Add shrinkage, concsolidation and wasteage 50% RM185.00 x 1.5 = RM277.50/m3 Labour cost Two unskilled worker per hour RM52.50/8x2 = RM13.13/h placing concrete RM13.13 x 0.6 = RM7.88/m3 Total Cost for lean concrete G15 RM277.50+RM7.88=RM285.38 Allow 15% profit including overhead RM285.38 x 1.15= RM328.19/m3 RM328.19/m3 x 0.05(thk) = RM16.41/m2
  • 2. Calculation for reinforced concrete G25 material cost Add shrinkage, concsolidation and wasteage 50% RM195.00 x 1.5 = RM292.50/m3 Plant cost Vibrator per day RM360.00/8 = RM45.00/h per m3 RM45.00 / 1.2 = RM37.5/m3 Labour cost Two unskilled worker per hour RM52.50/8x2 = RM13.13/h placing concrete RM13.13 x 0.6 = RM7.88/m3 Reinforcement work labour cost per m3 RM52.50/8=RM6.56/h RM6.56 x 0.55 = RM3.61/m3 Total cost for reinforced concrete G25 RM292.50 + RM37.5 + RM7.88 + RM3.61 = RM341.49/m3 Allow 15% profit including overhead RM341.49 x 1.15= RM392.71/m3 Calculation for reinforced concrete G30 material cost Add shrinkage, concsolidation and wasteage 50% RM210.00 x 1.5 = RM315.00/m3 Plant cost Vibrator per day RM360.00/8 = RM45.00/h per m3 RM45.00 / 1.2 = RM37.5/m3 Labour cost Two unskilled worker per hour RM52.50/8x2 = RM13.13/h placing concrete RM13.13 x 0.6 = RM7.88/m3 Reinforcement work labour cost per m3 RM52.50/8=RM6.56/hRM6.56 x 0.55 = RM3.61/m3 Total cost for reinforced concrete G30 RM315.00 + RM37.5 + RM7.88 + RM3.61 = RM363.99/m3 Allow 15% profit including overhead RM363.99 x 1.15= RM418.59/m3
  • 3. Hardcore Data Price material cost hardcore material RM7.5/m2 Allow 10% compaction Labour cost One unskilled worker, 8hours per day Allow 15% profir including overhead RM52.50/person Placing hardcore at 8m2/h Calculation for hardcore Material cost Allow 10% compaction RM7.50 x 1.10 = RM8.25/m2 Labour cost One unskilled worker per hour RM52.50/8 = RM6.56/h Placing hardcore RM6.56/1.2 = RM5.47/m2 Total cost for hardcore RM8.25 + RM5.47 = RM13.72/m2 Allow 15% profit including overhead RM13.72 x 1.15= RM15.78/m2
  • 4. 10mm dia high tensile Reinforcement Bar Cost Data Price material cost 10mm diameter bar delivered to site RM2700/tonne Allow labour stacking and loading RM7/tonne Tie wire at 0.66kg/100kg of reinforcement bar RM500/tonne Allow spacers for rebar RM6/tonne Allow 7% waste Allow margin RM22/tonne Allow 15% profit including overhead Labour cost One skilled labour, 8hours/day RM125/person one unskilled worker, 8hours/day RM52.50/person Allow 10% idling time Select 28 minutes Cut 32 minutes Bend 35 minutes Fix 23 minutes Hoist Twice 7 minutes calculation for 10mm h.t bar material cost 10mm diameter h.t bar RM2700/tonne Allow labour stacking and loading RM7/tonne Tie wire (0.66kg/100kg) x 1000 x (500/1000) = RM3.3/tonne Spacer RM6/tonne Allow 7% waste RM2700 x 0.07 = RM189/tonne Margin RM22/tonne Total RM2927.3/tonne Labour cost Skilled worker per hour Rm125/8 = RM15.63/h One unskilled worker per hour RM52.50/8 = RM6.56/h total RM15.63 + RM6.56 = RM22.19/h Allow 10% idling time RM22.19 x 1.10 = RM24.41/h Time required for Select, cut, bend, fix and hoist twice (28+32+35+23+7)minutes = 125minutes Labour cost (125minutes / 60) x RM24.41 = RM50.85/kg = RM508.54/tonne Total cost for 10mm h.t bar RM2927.3 + RM508.54 = RM3435.84/tonne Allow 15% profit including overhead RM3435.84 x 1.15= RM3951.22/tonne
  • 5. 12mm dia high tensile Reinforcement Bar Cost Data Price material cost 12mm diameter bar delivered to site RM2700/tonne Allow labour stacking and loading RM7/tonne Tie wire at 0.66kg/100kg of reinforcement bar RM500/tonne Allow spacers for rebar RM6/tonne Allow 7% waste Allow margin RM22/tonne Allow 15% profit including overhead Labour cost One skilled labour, 8hours/day RM125/person one unskilled worker, 8hours/day RM52.50/person Allow 10% idling time Select 28 minutes Cut 32 minutes Bend 35 minutes Fix 23 minutes Hoist Twice 7 minutes calculation for 12mm h.t bar material cost 12mm diameter h.t bar RM2700/tonne Allow labour stacking and loading RM7/tonne Tie wire (0.66kg/100kg) x 1000 x (500/1000) = RM3.3/tonne Spacer RM6/tonne Allow 7% waste RM2700 x 0.07 = RM189/tonne Margin RM22/tonne Total RM2927.3/tonne Labour cost Skilled worker per hour Rm125/8 = RM15.63/h One unskilled worker per hour RM52.50/8 = RM6.56/h total RM15.63 + RM6.56 = RM22.19/h Allow 10% idling time RM22.19 x 1.10 = RM24.41/h Time required for Select, cut, bend, fix and hoist twice (28+32+35+23+7)minutes = 125minutes Labour cost (125minutes / 60) x RM24.41 = RM50.85/kg = RM508.54/tonne Total cost for 12mm h.t bar RM2927.3 + RM508.54 = RM3435.84/tonne Allow 15% profit including overhead RM3435.84 x 1.15= RM3951.22/tonne
  • 6. 16mm dia high tensile Reinforcement Bar Cost Data Price material cost 16mm diameter bar delivered to site RM2650/tonne Allow labour stacking and loading RM7/tonne Tie wire at 0.66kg/100kg of reinforcement bar RM500/tonne Allow spacers for rebar RM6/tonne Allow 7% waste Allow margin RM22/tonne Allow 15% profit including overhead Labour cost One skilled labour, 8hours/day RM125/person one unskilled worker, 8hours/day RM52.50/person Allow 10% idling time Select 28 minutes Cut 32 minutes Bend 35 minutes Fix 23 minutes Hoist Twice 7 minutes calculation for 16mm h.t bar material cost 16mm diameter h.t bar RM2650/tonne Allow labour stacking and loading RM7/tonne Tie wire (0.66kg/100kg) x 1000 x (500/1000) = RM3.3/tonne Spacer RM6/tonne Allow 7% waste RM2650 x 0.07 = RM185.5/tonne Margin RM22/tonne Total RM2873.8/tonne Labour cost Skilled worker per hour Rm125/8 = RM15.63/h One unskilled worker per hour RM52.50/8 = RM6.56/h total RM15.63 + RM6.56 = RM22.19/h Allow 10% idling time RM22.19 x 1.10 = RM24.41/h Time required for Select, cut, bend, fix and hoist twice (28+32+35+23+7)minutes = 125minutes Labour cost (125minutes / 60) x RM24.41 = RM50.85/kg = RM508.54/tonne Total cost for 16mm h.t bar RM2873.8 + RM508.54 = RM3382.34/tonne Allow 15% profit including overhead RM3382.34 x 1.15= RM3889.69/tonne
  • 7. 8mm dia mild steel Reinforcement Bar Cost Data Price material cost 8mm diameter bar delivered to site RM 1250/ 800kg Allow labour stacking and loading RM7/tonne Tie wire at 0.66kg/100kg of reinforcement bar RM500/tonne Allow spacers for rebar RM6/tonne Allow 7% waste Allow margin RM22/tonne Allow 15% profit including overhead Labour cost One skilled labour, 8hours/day RM125/person one unskilled worker, 8hours/day RM52.50/person Allow 10% idling time Select 28 minutes Cut 32 minutes Bend 35 minutes Fix 23 minutes Hoist Twice 7 minutes calculation for 8mm m.s bar material cost 8mm diameter h.t bar 1250/800 x 1000 RM1562.5/tonne Allow labour stacking and loading RM7/tonne Tie wire (0.66kg/100kg) x 1000 x (500/1000) = RM3.3/tonne Spacer RM6/tonne Allow 7% waste RM1562.5 x 0.07 = RM109.38/tonne Margin RM22/tonne Total RM1710.18/tonne Labour cost Skilled worker per hour Rm125/8 = RM15.63/h One unskilled worker per hour RM52.50/8 = RM6.56/h total RM15.63 + RM6.56 = RM22.19/h Allow 10% idling time RM22.19 x 1.10 = RM24.41/h Time required for Select, cut, bend, fix and hoist twice (28+32+35+23+7)minutes = 125minutes Labour cost (125minutes / 60) x RM24.41 = RM50.85/kg = RM508.54/tonne Total cost for 8mm m.s bar RM1710.18 + RM508.54 = RM2218.72/tonne Allow 15% profit including overhead RM2218.72 x 1.15= RM2551.53/tonne
  • 8. 10mm dia mild steel Reinforcement Bar Cost Data Price material cost RM1802 /tonne 10mm diameter bar delivered to site RM/tonne Allow labour stacking and loading RM7/tonne Tie wire at 0.66kg/100kg of reinforcement bar RM500/tonne Allow spacers for rebar RM6/tonne Allow 7% waste Allow margin RM22/tonne Allow 15% profit including overhead Labour cost One skilled labour, 8hours/day RM125/person one unskilled worker, 8hours/day RM52.50/person Allow 10% idling time Select 28 minutes Cut 32 minutes Bend 35 minutes Fix 23 minutes Hoist Twice 7 minutes calculation for 10mm m.s bar material cost 10mm diameter h.t bar RM1802/tonne Allow labour stacking and loading RM7/tonne Tie wire (0.66kg/100kg) x 1000 x (500/1000) = RM3.3/tonne Spacer RM6/tonne Allow 7% waste RM1802 x 0.07 = RM126.14/tonne Margin RM22/tonne Total RM1966.44/tonne Labour cost Skilled worker per hour Rm125/8 = RM15.63/h One unskilled worker per hour RM52.50/8 = RM6.56/h total RM15.63 + RM6.56 = RM22.19/h Allow 10% idling time RM22.19 x 1.10 = RM24.41/h Time required for Select, cut, bend, fix and hoist twice (28+32+35+23+7)minutes = 125minutes Labour cost (125minutes / 60) x RM24.41 = RM50.85/kg = RM508.54/tonne Total cost for 10mm m.s bar RM1966.44 + RM508.54 = RM2474.98/tonne Allow 15% profit including overhead RM2474.98 x 1.15= RM2846.23/tonne
  • 9. A6:2.61kg/m2 layer of Steel Fabric Reinforcement Cost Data Price A6:2.61kg/m2 RM10.00/m2 Allow 5% wastage Lablour cost 2 unskilled labour, 8hoours/day RM52.50/person allow 10% idling time Allow 15% profit including overhead Calculation for BRC A6:2.61kg/m2 material cost Allow 5% wastage RM10 x 1.05 = RM10.5 Labour cost Two unskilled worker per hour RM52.50/8x2 = RM13.13/h allow 10% idling time RM13.13 x 1.10 = RM14.14/h total cost RM10.5 + RM14.14 = RM24.64/m2 Allow 15% profit including overhead RM24.63 x 1.15% = RM28.34/m2 A8:3.01kg/m2 layer of Steel Fabric Reinforcement Cost Data Price A8:3.01kg/m2 RM12.10/m2 Allow 5% wastage Lablour cost 2 unskilled labour, 8hoours/day RM52.50/person allow 10% idling time Allow 15% profit including overhead Calculation for BRC A8:3.01kg/m2 material cost Allow 5% wastage RM12.10 x 1.05% = RM12.71/m2 Labour cost Two unskilled worker per hour RM52.50/8x2 = RM13.13/h allow 10% idling time RM13.13 x 1.10 = RM14.14/h total cost RM12.71 + RM14.14 = RM26.85 Allow 15% profit including overhead RM26.85 x 1.15% = RM30.88/m2