FWOL to Transfer EnBW Baltic 2 Crew

FRS Windcat Offshore Logistics (FWOL) and EnBW Energie Baden-Württemberg AG have signed a five-year crew transfer contract for EnBW Baltic 2 wind farm in the German Baltic Sea.

From 1 July 2015, the crew transfer vessel “Windcat 34” will sail daily from Rostock to the offshore wind farm EnBW Baltic 2 in the German Baltic Sea.

EnBW Baltic 2 is being constructed 32 kilometres north of the Baltic island of Rügen. The erection of the turbines is currently in full swing with 44 wind turbines already installed.

With 80 wind power turbines and a total capacity of 288 megawatts the offshore wind farm can generate 1,200 gigawatt hours of electricity per year. That covers the theoretical requirements of around 340,000 households and will save 900,000 tonnes of CO2.

Image: enbw