Type text h


2 October 2014
Company Announcements Officer
ASX Limited
Exchange Centre
Level 4, 20 Bridge Street
SYDNEY NSW 2000
Dear Sir,

Re: POSEIDON SIGNS NICKEL OFFTAKE AGREEMENT

We enclose herewith a copy of an announcement in relation to the above. Yours faithfully

David P.A. Singleton MANAGING DIRECTOR & CHIEF EXECUTIVE OFFICER


Enc

CORPORATE DIRECTORY Principal Office

Unit 8, Churchill Court Director / Senior Management 331-335 Hay Street David Singleton Managing Director & Chief Executive Officer SUBIACO WA 6008

Chris Indermaur Non-Executive Chairman P: 61 8 9382 8799

Geoff Brayshaw Non-Executive Director F: 61 8 9382 4760

Robert Dennis Non-Executive Director

Ross Kestel Company Secretary Registered Office

Level 2, Spectrum

100 Railway Road

Corporate Enquiries SUBIACO WA 6008

Mr David Singleton - MD & CEO P: 61 8 9367 8133

P: 61 8 9382 8799 F: 61 8 9367 8812

F: 61 8 9382 4760

E: admin@poseidon-nickel.com.au

Media Enquiries

P: 61 8 9382 8799

F: 61 8 9382 4760

Shareholder Enquiries E: admin@poseidon-nickel.com.au

Enquiries concerning shareholdings should be addressed to:

Home Exchange

Computershare Investor Services The Company's shares are listed

GPO Box D182, Perth WA 6840 on the Australian Securities Exchange

P: 61 8 9323 2000 and the home exchange is Perth

ASX code: POS

P O S E I D O N N I C K E L L I M I T E DUnit 8Churchill Court331-335 Hay StreetSubiacoWA 6008

PO Box 190 West Perth WA 6872 T +618 9382 8799 F +618 9382 4760 www.poseidon-nickel.com.au ABN 60 060 525 206

Page 2


ASX Announcement 2 October 2014

Poseidon signs nickel offtake agreement

Poseidon Nickel has signed a conditional offtake agreement with BHP Billiton

Nickel West (Nickel West)

Contract is for 2 years and renewable for a further 2 years

Ore from Mt Windarra to be toll treated at Nickel West's Leinster concentrator.

Nickel West will purchase all concentrate from the concentrator at an agreed rate

Poseidon retains the option to transport and process additional ore tonnes from

Windarra at the Black Swan plant that it is purchasing from Norilsk Nickel

Poseidon Nickel Limited (Poseidon) (ASX:POS) is pleased to announce a conditional offtake agreement with Nickel West. The agreement is in the form of an ore tolling and concentrate purchase agreement (OTCPA). The OTCPA is for the supply of ore to be mined by Poseidon at Windarra and hauled to Nickel West's existing concentrator at Leinster for toll treatment into a smeltable grade concentrate. Nickel West will purchase all of the concentrate produced.
The agreement is the successful culmination of months of work by the two companies including an extensive test work programme to demonstrate the compatibility of the Windarra ore with material treated at Leinster. Poseidon has referred to negotiating with offtake parties for Windarra material in previous Company announcements, and this announcement brings these to a conclusion.
Poseidon CEO, David Singleton said, "The signing of an offtake deal with Nickel West continues a series of strategic steps that we have been committed to over the last year. We have removed the capital funding risk for the Company through the Black Swan acquisition, developed depth to the Company with the acquisition of Lake Johnston, and provided a clear route to market through the offtake arrangement with Nickel West. We thoroughly believe, like most analysts, in the future of the nickel market, given renewed strength in demand for nickel and limited new supply, and believe that Poseidon is now well structured to grow into that market"
The OTCPA is for an initial period of 2 years, ending in February 2017, with first ore deliveries due no later than February 2015, subject to satisfaction of condition precedents including the parties obtaining necessary regulatory approvals. Nickel West has the option to extend the contract term by 1 or 2 contract years. The contract is for a minimum quantity of 350,000 tonnes of ore per annum and a maximum of 500,000 tonnes which can be extended to 700,000 tonnes by mutual agreement. The ore will be mined at the Mt Windarra site and transported to Nickel West's Leinster facility for concentrating.
Poseidon will pay a treatment charge to Nickel West for every tonne of ore processed to be offset against payments by Nickel West for the concentrate produced. The processing of ore at Leinster reduces the costs of commencing operations at Windarra to approximately $11m plus working capital, from the previously reported figure of $290m. The company is well progressed on funding options to support the commencement of ore deliveries in the timescales envisaged.

Page 3

Poseidon has previously announced its intention to mine at Windarra and ship ore to the Black Swan plant that the Company is currently purchasing from Norilsk Nickel. Poseidon has sufficient production capacity between its Mt Windarra and Cerberus ore bodies to deliver both to Nickel West and to Black Swan.

ORE RESERVE STATEMENT

Windarra Nickel Sulphides

Ore Reserve Category (JORC 2004)

Windarra Nickel Sulphides

Probable

Windarra Nickel Sulphides

Tonnes

Ni% Grade

Ni Metal t

Cerberus

1,221,000

1.3

16,000

Mt Windarra

498,000

1.78

9,000

Total

1,719,000

1.44

25,000

Table 1: Windarra Nickel Project Ore Reserve Statement MINERAL RESOURCE STATEMENT Windarra Nickel Cut Off Mineral Resource Category (JORC 2004) Indicated Inferred TOTAL Project Sulphides Grade Tonnes Ni% Grade Ni Metal t Tonnes Ni% Grade Ni Metal t Tonnes Ni% Grade Ni Metal t Mt Windarra 0.75% 1,217,000 1.39 17,000 3,553,000 1.78 63,000 4,770,000 1.68 80,000 South Windarra

0.80% 772,000 0.98 8,000 - - - 772,000 0.98 8,000

Cerberus 0.75% 2,773,000 1.25 35,000 1,778,000 1.91 34,000 4,551,000 1.51 69,000 Total Sulphide 4,762,000 1.24 60,000 5,331,000 1.82 97,000 10,093,000 1.55 157,000 Black Swan Nickel Cut Off Mineral Resource Category (JORC 2012) Measured & Indicated Inferred TOTAL Project Sulphides Grade Tonnes Ni% Grade Ni Metal t Tonnes Ni% Grade Ni Metal t Tonnes Ni% Grade Ni Metal t Black Swan 0.40% 9,600,000 0.68 64,900 21,100,000 0.54 113,800 30,700,000 0.58 178,700 Total Black Swan 9,600,000 0.68 64,900 21,100,000 0.54 113,800 30,700,000 0.58 178,700 Table 2: Windarra and Black Swan Nickel Project Mineral Resource Statement

Page 4

Windarra Gold

Tailings Project

Mineral Resource Category (JORC 2004)

Windarra Gold

Tailings Project

Indicated

Windarra Gold

Tailings Project

Tonnes (kt)

Grade (g/t)

Au (oz)

Total Gold Tailings

11,000

0.52

183,000

Table 3: Windarra Gold Tailings Project Mineral Resource Statement

Note: Totals in the tables may not be mathematically accurate due to JORC rounding requirements.

Notes

The information in this report which relates to the Black Swan Mineral Resource is based on information compiled by Andrew Weeks who is a full-time employee of Golder Associates Pty Ltd, and Member of the Australasian Institute of Mining and Metallurgy. Andrew Weeks has sufficient relevant experience to the style of mineralisation and type of deposit under consideration and to the activity for which he is undertaking to qualify as a Competent Person as defined in the JORC Code (2012).

The information in this report that relates to the Windarra Nickel Project, Mineral Resources is based on information compiled by Mr Neil Hutchison, General Manager of Geology at Poseidon Nickel, who is a Member of The Australian Institute of Geoscientists and Mr I Glacken who is a Fellow of the Australasian Institute of Mining and Metallurgy as well as a full time employee of Optiro Pty Ltd.

The information in this report that relates to Ore Reserves at the Windarra Nickel Project is based on information compiled b y Mr Denis Grubic, who is a Member of The Australasian Institute of Mining and Metallurgy as well as a full time employee of Rock Team Pty Ltd.

Mr Hutchison, Mr Glacken, Mr Weeks and Mr Grubic all have sufficient experience which is relevant to the style of mineralisat ion and type of deposits under consideration and to the activity which they are undertaking to qualify as a Competent Person as defined in the 2004 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves' (the JORC Code 2004). Mr Hutchison, Mr Glacken, Mr Weeks and Mr Grubic have consented to the inclusion in the report of the matters based on his information in the form and context in which it appears.

Mineral Resources in this document are reported under JORC 2004 Guidelines as there has been no Material Change or Re- estimation of the Mineral Resource since the introduction of the JORC 2012 Codes. Future estimations will be completed to JORC

2012 Guidelines.

The Australian Securities Exchange has not reviewed and does not accept responsibility for the accuracy or adequacy of this release.