Case Study

MS Series Bar Screen Handles Conditions Where Other Screens Failed

Source: Headworks International Inc.

The Cadiz street Pump Station in Dallas, Texas collects wastewater and pumps it across the Trinity River to the Central Wastewater Treatment Plant. In 2000, Headworks® Inc. was awarded a contract for two Headworks MS Series Bar Screens to replace equipment installed in 1999 that had failed under extreme flow conditions and flooded the Pump Station.

There were several challenges associated with the installation. First, the older design of the building was not crane accessible. Second, the channel length was limited and required both screens to operate vertically at a 90° angle. Headworks addressed these challenges by supplying the 43.82 feet (13.4 meters) long bar screens in three sections. Integral bypass capability was also engineered for each screen to protect the pump station from flooding, if the screens were down for any reason in the future.

access the Case Study!

Get unlimited access to:

Trend and Thought Leadership Articles
Case Studies & White Papers
Extensive Product Database
Members-Only Premium Content
Welcome Back! Please Log In to Continue. X

Enter your credentials below to log in. Not yet a member of Water Online? Subscribe today.

Subscribe to Water Online X

Please enter your email address and create a password to access the full content, Or log in to your account to continue.

or

Subscribe to Water Online